Building the Chinook

Construction de notre 

2002/05/25

Step 47, 17A

Elevator pulley

This one was a lot of work because of all the adjustments and checks that have to be done each time a rivet is popped.  The major problem is that the surface below the brackets is not flat!  Also, in order to get the cable far enough from the rivets that are already installed, the pulley has to be lowered by a few millimeters by bending the two brackets.
 

Back