Building the Chinook

Construction de notre 

2002/03/26


 

Steps 8A, 9A, 10A, 11A, 12A and 13A

March 26th, 2002
Installation of pylons

Installation of leading edge channel
Installation of post plate
Installation of seat belt plate & bottom wing channel
Installation of pylon rear brace
Installation of seat belt & wing channel bottom bolt
Installation of pylon side & cabin side channels
 
 
Frédéric installs the pylon rear brace and tightens everything.

 
 
Finished product as verified by Nancy.
Time to turn out the lights!

Back